top of page

Distribution Centre, Yorkshire - Value Engineering
Steel tonnage reduced from approximately 4,950 to 4,200 tonnes - a saving of around 750 tonnes, or 15% - through revised truss configurations across 16-31 m spans and optimised main column design.

bottom of page